English translation for "permeable materials"
|
- 透水材料
Related Translations:
permeable: adj.能渗透[透过、穿过]的(to)。 permeable plastics 可透塑料。adv.-ably ,-ness n.
- Example Sentences:
| 1. | The distribution among the little attendants permeable material extraction alone jade carved pine , water spray , and the quiet river boat in the boat to admire the view of the poet , carving vivid characters , the characters formed a lively you cliff map 中间分布的点点翠色透水料独玉摘雕松树,流水浪花以及河面上静静的小船,船上的诗人赏景,人物雕刻生动,组成了一幅气韵生动的游赤壁图。 | | 2. | Finally , this paper brings forward the mix integrated design method of asphalt treated permeable material incorporating the results of structure analyses and tests . and the rational proposal and requirement for pavement subsurface drainage system of test road is suggested 结合结构分析与室内试验分析的结果,提出了沥青稳定碎石排水层混合料的综合设计方法,并实际运用于试验路的结构设计和排水系统设计。 | | 3. | The distribution among the little white permeable material alone pick carved jade tree , water spray , and the quiet river boats , three friends on board vessels on road , heart - to - heart to admire the view , carving vivid life , artistically composed of a lively night chibi map 中间分布的点点白色透水料独玉摘雕松树,流水浪花以及河面上静静的小船,三位友人船上船论道,赏景谈心,人生雕刻生动,组成了一幅气韵生动的夜游赤壁图。 | | 4. | A brief introduction is given to the treatment of the zeya dam foundation , principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir . as for the excavation of the sand - gravel zones , except the toe slab and its 1 / 9 bottom width down stream , the alluvial layers are excavated to the micro - weathered rocks , while the other sections remain unexcavated . regarding to the treatment of the fracture zones , concrete filling is used for the toe slabs and semi - permeable materials are used for other section . according to the construction characteristics , a filter is placed in the down stream embankment foot . to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted . as a result safety , economic benefit , convenience in construction and good performace are achieved 简要论述泽雅水库面板堆石坝坝基处理和防渗的原则及设计要点.趾板基础和堆石体各区砂砾石基础开挖,除趾板与其下游1 / 9底宽范围以及坝脚挖除冲积层至弱风化(局部微风化)基岩外,其余部分均予以保留.断层破碎带处理,趾板部位采用混凝土塞,其它部位采用半透水料置换,并根据本工程特点在下游坝脚加设了反滤层.为提高坝基的整体性和防渗性能,对趾板进行了固结和帷幕灌浆.达到了安全、经济、便于施工的目的,运行情况良好,可为面板堆石坝的设计和研究提供参考与借鉴 | | 5. | Considering that the ferrite core is often made from good permeable material , the dissertation presents the condition that the normal component of the magnetic field strength is zero approximately at the inside surface of good permeable material , i . e . bn = 0 to determine the eigenvalues for the separation constant . during the solving process , the solenoid coil is supposed to be wound closely by infinite symmetrical delta - coils 考虑到磁芯通常是由导磁性能非常好的软磁材料构成,本文提出利用靠近良导磁材料内侧磁场强度法向分量近似为零,即b _ n 0 ,这一边界条件,来确定边值问题中的本征值。 | | 6. | Then , using statistical method , performance indexes are compared , and the prior layer setting is obtained . through elaborate indoor tests , the drainage performance , mechanics performance and durability of asphalt treated permeable material are researched . by statistical analyses of vast test data , the balance range of air voids is obtained , via performance tests in different saturation conditions , the durability of the material is gained 对沥青稳定碎石排水层混合料的材料组成进行了精心的室内试验设计,依据室内试验结果,对沥青稳定碎石排水层混合料的透水性能、力学性能和耐久性能进行了各种因素的影响分析,经数理统计分析获得了有关性能指标之间的经验关系,找到了透水性能和力学性能之间的平衡点。 | | 7. | A brief introduction is given to the treatment of the zeya dam foundation , principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir . as for the excavation of the sand - gravel zones , except the toe slab and its 1 / 9 bottom width down stream , the alluvial layers are excavated to the micro - weathered rocks , while the other sections remain unexcavated . regarding to the treatment of the fracture zones , concrete filling is used for the toe slabs and semi - permeable materials are used for other section . according to the construction characteristics , a filter is placed in the down stream embankment foot . to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted . as a result safety , economic benefit , convenience in construction and good performace are achieved 介绍碧莲水电站拦水坝系软基上的水力自控翻板闸门溢流坝工程特点和设计原理.闸门利用水力和杠杆原理实现自控关闭;闸坝平时挡水发电,洪水期自动翻倒泄洪冲砂,有效地解决洪水对上游库区实物的淹没损失及水库泥沙淤积问题;闸坝采用地下混凝土连续墙进行地基防渗处理及面流消能,消能效果显著,工程投资少.本工程设计可供其它建固定坝淹没损失过大或在软基上建低重力式堰坝的类似工程参考 | | 8. | It is commonly recognized that subsurface drainage system can improve pavement performance and extend service life . as an essential part of subsurface drainage system , the layer setting and characteristics of asphalt treated permeable material directly affect the performance of subsurface drainage system , which is lucubrated in this paper . based on the typical semi - rigid pavement without permeable layer , using multilayer elastic system program , rational pavement structure with permeable layer at different locations is first analyzed 本文以高等级公路沥青路面的典型结构形式作为未设排水层的路面结构原型,通过不同的设置层位分析对排水层的回弹模量和厚度的要求,探讨设置排水层的路面结构的一些结构参数适宜的取值范围,并在此基础上运用灰色系统关联分析方法,对不同设置层位的路面结构的技术指标进行比较分析,得出较优的层位设置方案。 |
- Similar Words:
- "permeable joints" English translation, "permeable layer" English translation, "permeable level" English translation, "permeable mass" English translation, "permeable material" English translation, "permeable media" English translation, "permeable medium" English translation, "permeable membrane" English translation, "permeable membranes" English translation, "permeable network" English translation
|
|
|